J.H.K. Group contributes to the modernization of the ship lift at Lüneburg
  • J.H.K. Group
  • News
  • J.H.K. Group contributes to the modernization of the ship lift at Lüneburg

J.H.K. Group contributes to the modernization of the ship lift at Lüneburg

By order of Nobiskrug GmbH the department of Electrical Plant Engineering carries out the complete set of electroinstallation works for the renovation of the West trough of the ship lift Lueneburg/Scharnebeck. The order includes the inventory and disassembly of the existing electrical installation with subsequent partial reassembly and renewal.

Go back

© 2024 J. Heinr. Kramer Holding GmbH & Co. KG